Environment change-freeze

An approval gate answers who may approve. It cannot answer whether anyone should right now.

During a month-end close, a holiday, or an incident, that gap is filled socially: someone posts “nobody deploy to prod today” and hopes. The gate is still armed, still clickable, and the person who approves at 23:40 was not in that channel.

A change-freeze makes it systemic. While production is frozen, gocdnext admits no promotion to it:

Action during a freezeResult
Approving a gate that governs the frozen environment409 — the error names every frozen environment that gate governs
Dispatching a job that targets it — a deploy or a migration (see below)Held: the job stays queued, the run shows Frozen: production
Rolling back that environment409
Rejecting a gateAllowed — see below

Rejecting is deliberately never refused. “Stop this from shipping” is exactly the decision you still want available during a freeze.

Freezing

Freeze from the Environments tab of a project, or via the API. A reason is required — it is what every operator whose deploy is refused will read, and a freeze nobody can explain at 03:00 is the failure this feature exists to prevent.

Terminal window
# freeze
curl -X PUT /api/v1/projects/shop/environment-freezes/production \
-H 'Content-Type: application/json' \
-d '{"reason":"month-end close — no prod deploys until 2026-08-03"}'
# lift it
curl -X DELETE /api/v1/projects/shop/environment-freezes/production
MethodPathEffect
PUT/api/v1/projects/{slug}/environment-freezes/{name}freeze; body {"reason": "..."} (required, ≤500 chars)
DELETE/api/v1/projects/{slug}/environment-freezes/{name}lift the freeze
GET/api/v1/projects/{slug}/environmentsfreeze state per environment

Both writes are maintainer+. Both are idempotent: re-freezing an already-frozen environment does not reset who froze it, when, or why — the original record is what an audit asks about.

The environment does not have to exist yet

This is the case worth understanding, because it is the one a freeze most needs to cover.

Environments are lazy: the production environment is created the first time a job actually deploys to it. So on a pipeline whose prod stage has never run, there is no environment row to attach anything to — and the first-ever deploy to production is precisely the one you cannot afford to let through.

Freezes are therefore keyed by (project, environment name), not by an environment id. You can freeze a name that nothing has ever deployed to, and it appears in the Environments tab as a card of its own with no history and no version — just the freeze. The first deploy that would have created that environment is held instead.

The same keying means a freeze survives deleting the environment. Deleting a frozen environment leaves the freeze behind (still visible, still liftable), so delete-and-recreate is not a way to launder one away.

Migrations and other jobs that act on an environment

A deploy: marker is not the only way a job touches production. A database migration is a plain goose/kustomize job — it changes prod, but it declares no deploy:, so on its own a freeze could not see it.

Declare the environment on the job with environment::

jobs:
migrate-prod:
stage: migration
image: goose
script: ["goose up"]
environment: production # this job ACTS ON production

A freeze on production now holds migrate-prod at dispatch exactly like a deploy, and — because the gate that governs it is freeze-aware too — the approve → migrate gate in front of it is refused with a 409 while the freeze is on. A single-job rerun of the migration is held the same way.

environment: is valid on any executable job. It is rejected on an approval gate (a gate governs an environment through the jobs after it; it does not act on one) and on a job that runs nothing. If a job carries both deploy: and environment:, they must name the same environment.

This is declare-the-env, and it is opt-in. A freeze holds a job because the job says which environment it targets — not because it happens to point at a protected cluster. A job that runs against a prod cluster without an environment: (or deploy:) is not held.

Inheriting environment: through extends: is not supported yet — declare it directly on the job.

Two things that surprise people

The name must match exactly — including case. The freeze is matched against the environment name in your pipeline YAML (deploy.environment or a job’s environment:), as a plain string. Freezing production does not hold a job that declares environment: prod, and Production is a different environment from production. If a job you expected to be held is running, check the name first.

A freeze holds the jobs that target the environment, not the whole run. A stage with a frozen production job and a staging job that isn’t frozen will still run staging. The run displays the freeze as its dominant queue reason because that is the blocker a human has to act on — it does not mean everything stopped.

What the guarantee covers

The guarantee is at the admission boundary: once the freeze call returns, no new job targeting that environment (a deploy or a migration) is admitted.

A job admitted just before the freeze committed still runs to completion — the agent already has it, or the ArgoCD sync already went out. Freezing does not reach across the network to stop work in flight, and gocdnext does not pretend otherwise: cancelling an in-flight job is a separate action you take deliberately.

In practice the window is the moment between a job being assigned and the freeze landing. Everything queued behind it is held.

Lifting a freeze

Lifting is one click, no reason required. Runs that were being held are woken immediately rather than waiting for the next scheduler tick, so held jobs resume in about a second. There is no re-approval: a gate that was already approved stays approved.

If a held run somehow isn’t woken, the scheduler’s periodic tick picks it up on its next pass — the immediate wake is an optimisation over that backstop, not a replacement for it.

Who sees what

GET /environments is readable by any authenticated user, and the response is role-sanitised:

FieldViewerMaintainer / admin
frozen, frozen_at
freeze_reason, frozen_by❌ redacted

That split is deliberate. “Production is frozen” is operational state everyone needs in order to understand why their pipeline is waiting. The reason routinely names an incident, a customer, or an audit finding (“frozen: PCI finding INC-4412”), which is not viewer-grade information.

Write it for the maintainer who will read it, not as a broadcast.

Audit

Freeze and unfreeze each write an environment.freeze / environment.unfreeze row in the same transaction as the change itself, so a freeze can never exist without a record of who set it and why. The actor is derived server-side from the authenticated session — never from anything the client sends.

Events are keyed target_type=environment, target_id=<project_id>:<name>, which is what lets an investigation filter to one project’s freezes even for an environment that has never been deployed to.

What this is not

  • Not a pipeline pause. The unit is a deploy environment, not a pipeline. Freezing production holds every job in the project that targets it — a deploy or a migration — but it does not stop those pipelines from building and testing, or from shipping to other environments.
  • Not a cancel. Work already admitted finishes. See What the guarantee covers.
  • Not scheduled. Freezes are manual: someone sets it, someone lifts it. Calendar-driven freezes are not implemented.
  • Not org-wide. A freeze is per project and per environment name. Freezing “everything” means freezing each one.
  • Not a control over external GitOps. If ArgoCD auto-syncs your cluster from a Git branch, a freeze governs what gocdnext admits — it cannot stop a sync it doesn’t drive.